I made a list of whats left till its first snow wheelin trip comin up soon hopefully... looks long but really not too bad I dont think
-get brake proportioning valve installed
-install brake lines, calipers, new pads
-rear diff armor & axle gusset
-rear cage
-mount fuel tank
-mount batteries
-build battery cabels
-install tool box
-belly skid-plate
-motor/tranny skid-plate
-install new clutch master & slave cylender
-build line for clutch
-mount fuel line to frame
-install starter
-install maf sensor & air filter
-mini header & exhaust w/my flowmaster
-install radiator hoses
-install new guages & build panel for the cluster
-install rock lights
-install stereo
-build tranny tunnel
-install carpet kit
-paint cab & cage
-build new rear crossmember with receiver and shackle mounts (kind-of bumper)
-install power-steering box & hydro ram
-install
steering knuckles & arp studs
-30 spline longs
obviously I could go wheelin without a lot of these things but I really wanna get this much done before I go out and beat it up...