Author Topic: Project Snoopy: 85 4Runna - Rebuild 1.0  (Read 159578 times)

0 Members and 3 Guests are viewing this topic.

Jordan7118

  • Offline The 1K Club
  • *
  • Turtle Points: -21
  • Male Posts: 1,105
  • Member since May '07
    • View Profile
 :thud:

I've got to stop getting carried away at the shop...  :idiot:

I rolled the single beadlocked tire to the front and mounted it up. It looks pretty swell, me thinks, and I'm really surprised how far forward the tire sits. The quick air down works very well, and I was surprised the tire was at 3 psi in the pic  :o




Then, I worked on the t-case mount. I think I have that squared away. Like all things, I had to redo it several times because I had too much bushing length for the crossmember. I cut the bushings (rubber) and got it all up in my hair and face. I just got out of the shower, and 45 minutes later using soap, shampoo, and a washcloth in my hair, I think I've escaped getting a buzz haircut  :ack:

I was able to get the frame plates mounted, and I'll put the sleeves in tomorrow. Work is slow, but I'm apparently detail-oriented... or just slow  :screwy:

Hopefully, I'll wake up and go finish up some stuff. We'll see how that goes...  :nerv:


 
 
 
 
 

Related Topics

6 Replies
2654 Views
Last post Jun 30, 2006, 08:24:19 PM
by Tice
3 Replies
2152 Views
Last post Jul 09, 2006, 09:00:08 PM
by B-R-I-A-N
10 Replies
3274 Views
Last post Mar 29, 2012, 01:04:12 PM
by konarider1993
1 Replies
1343 Views
Last post Feb 16, 2012, 08:29:20 AM
by 83 Crawler
9 Replies
3999 Views
Last post Sep 15, 2014, 06:38:56 PM
by Phazertwo