And finally, as if this evening couldn't have gotten any better, it turns out that the stock T100 radiator hoses are a direct 100% bolt in
So I got alot done tonight and Im feel'n pretty good thus far. Tomorrow I will finish up with the radiator, order the correct fuel lines and finish those lines, and then start on the exhaust system I think.. I need to buy some pipe and get a muffler and cat. Hmmm. Might take a couple of days on that.
hmmmmm... what's left
Oh, I need to clean up the underside of the hood and get it painted...... hmmmmmm ah, I need to get the power steering cooler installed now that I got the radiator in. I'll see if I can get around to that tomorrow. Also I've got an oil cooler and filter relocater kit, so it looks like I'll be busy again tomorrow night.
Hopefully I will get the factory wiring book by Friday so I can have something to do this weekend. Hopefully I can get it 100% finished by friday except for the wiring. Also, the gas tank should be here by the end of the week so I'll need to get that mounted. One more thing is that I am not going to mount the battery in the engine compartment. I want to lower the CG as much as possible, so I will mount the battery beneath the bed. It will also help with weight distribution. That should be easy to do so Im not panicking about that job.
That's it for now, Night!
BigMike