I then welded on my brackets (note predrilled lift holes for drive train lift). Finally, I ground and clearanced 2x CV joints, drilled out all my flanges to 3/8"s holes, and built a front square tube drive shaft. I also took in a front CV shaft to Pat's Driveline in Langley, BC and got them to lengthen it to fit my rear axle. After that, I bolted everything together. Then I had some fun urban crawling, I mean testing out the new equipment...