the next part of the bed to be done will be a rail about 12in up that willl run the length of the bed and angle in and down at the dove to right next to the taillights. then a large hoop around the back of the cab to start the exo. ill propably run a couple of supports from the top of the hoop down to where the dove on the bed starts as well. kinda work it into the soon to be rail lol.