I then installed the brake / clutch master cylinder onto the fire wall of RevC (Not that much fun)
Cut the wheel wells for the shock hoops
Back RevB chassis up to RevC body.
Jacked up RevC and slid the chassis under it.. If only it was that easy
And this is as fare as I have gotten. It's taken me about 7 weeks to get this fare because the Rig is not at my house (roughly 70 miles away) and I can't only work on it on the weekends because of work.
Next I'm going to have to cut holes in the floor and grind some of the pinch seam line so the body sits on the frame mounts. The body sits about 3 inches higher than it should.