give them a call
That was the plan but did you notice the time I posted the thread?
I thought someone on here had already been down this road like Duffil (thanks BTW)
So I suppose I need the doubler 23 spline intermediate shaft and one 23 spline input shaft? The output shaft is the same 27 spline correct? Between a W56 and R151.
This is my only real weakness right now. I'm tired of carrying a spare T-case on trips and changing it out when I break the shafts. This will do until my next rig is online - sorry fellas, I'm going V-8 on that one, but this one is still will still be pounding the rocks when my friend takes it over.