Author Topic: Gnarly4X's 22RE Rebuild  (Read 192490 times)

0 Members and 2 Guests are viewing this topic.

ExCabSwap

  • Offline Crawler Guru
  • ****
  • Turtle Points: 1012
  • Male Posts: 676
  • Member since Jan '16
  • 3rd Gen ExCab Swap!
    • View Profile
    • Buy me a soda
Re: Gnarly4X's 22RE Rebuild
« Reply #390 on: Oct 09, 2016, 04:05:56 PM »
Easiest for mine was to attach the motor mounts to the block first.
Also, do you have any need of that bad motor mount? Any interest of getting rid of it?

For the pilot bearing in the future: grease mixed with newspaper shreddings, fill the back of the bearing with the grease mixture, and tap a thick bolt in it. Hydraulic pressure will push the bearing out

Sent from my LG-H830 using Tapatalk

1993 Standard cab chassis. 1989 Extended Cab. 22R-E BO .020, ENGNBLDR 261c cam, Doug Thorley Tri-Y header, Straight Pipe through a Flowmaster 40, ARB Rear Locker, York OBA with fabricated bracket.
Projects waiting in my shop: '83 Front Axle, TG Sliders, second tcase, NEW: XD 4.70 gears!

 
 
 
 
 

Related Topics

9 Replies
3326 Views
Last post Jun 01, 2005, 10:21:46 PM
by alfio
1 Replies
1067 Views
Last post Jul 05, 2006, 07:55:19 PM
by 79coyotefrg
6 Replies
1145 Views
Last post May 22, 2007, 08:44:53 AM
by Zoomschwortz
3 Replies
2035 Views
Last post Dec 13, 2007, 04:08:02 PM
by 84pickup
4 Replies
2190 Views
Last post Feb 23, 2010, 05:57:24 PM
by topkicktech