Author Topic: Gnarly4X's 22RE Rebuild  (Read 181428 times)

0 Members and 1 Guest are viewing this topic.

ExCabSwap

  • Offline Crawler Guru
  • ****
  • Turtle Points: 1012
  • Male Posts: 675
  • Member since Jan '16
  • 3rd Gen ExCab Swap!
    • Buy me a soda
Re: Gnarly4X's 22RE Rebuild
« Reply #390 on: Oct 09, 2016, 04:05:56 PM »
Easiest for mine was to attach the motor mounts to the block first.
Also, do you have any need of that bad motor mount? Any interest of getting rid of it?

For the pilot bearing in the future: grease mixed with newspaper shreddings, fill the back of the bearing with the grease mixture, and tap a thick bolt in it. Hydraulic pressure will push the bearing out

Sent from my LG-H830 using Tapatalk

1993 Standard cab chassis. 1989 Extended Cab. 22R-E BO .020, ENGNBLDR 261c cam, Doug Thorley Tri-Y header, Straight Pipe through a Flowmaster 40, ARB Rear Locker, York OBA with fabricated bracket.
Projects waiting in my shop: '83 Front Axle, TG Sliders, second tcase, NEW: XD 4.70 gears!

 
 
 
 
 

Related Topics

3 Replies
1943 Views
Last post Dec 13, 2007, 04:08:02 PM
by 84pickup
4 Replies
2120 Views
Last post Feb 23, 2010, 05:57:24 PM
by topkicktech
8 Replies
2417 Views
Last post Jun 22, 2010, 02:37:06 PM
by gtoyonrocks
0 Replies
854 Views
Last post Feb 23, 2012, 03:48:38 AM
by b_sherwood3
9 Replies
1856 Views
Last post Jan 08, 2016, 02:03:22 PM
by emsvitil