Author Topic: 85 Beastie Build - 2nd gen runner time!  (Read 25994 times)

0 Members and 3 Guests are viewing this topic.

golana

  • Offline Rock Crawl'n
  • **
  • Turtle Points: 45
  • Male Posts: 112
  • Member since Mar '11
  • The Crazy One
    • View Profile
    • analog OffRoad
Re: 85 Beastie Build - 2nd gen runner time!
« Reply #60 on: Jun 13, 2011, 10:29:41 AM »

sending unit hole


fuel pump hole


stock ford breather hole i think... i just made a round plate and sealed it up


threw some paint on it, just so it wont rust. im thinking of undercoating the whole thing!


im thinking, when i build the straps or something, i might build a small 1x1" sq. tube frame that holds the tank. would double as a skid plate too


now im just whoring pictures haha


modified fuel pump bracket. i was getting tired by this point... i welded the bracket on backwards and had to cut it off and welt it back on haha!


modified fuel sending unit


cut about 7" off the bottom, bent it at about 7" and then put the floaty thing on, then bent the end


fits perfect! i have about 1/4" clearance between the float and the bottom of the tank



BOB'S YOUR UNCLE!
-Steve

1994 4Runner - BUILD THREAD
5VZ-FE - 12" Lift - High Steer - Hydraulic Assist - IFS Mod - Scuba Mod - Ford Fuel Tank - E-Fan - Doubler = 96.31:1 Crawl Ratio

Brake setup
FRONT: 98 Tacoma Rotors/Brake Master Cylinder/Booster, 94 V6 Pickup Calipers, 86 IFS Hubs
REAR: 85 Solid axle Rotors/Calipers/Lug Studs, 1/4" Wheel Spacer

 
 
 
 
 

Related Topics

408 Replies
107411 Views
Last post Oct 03, 2010, 08:54:32 PM
by John Doe
3 Replies
1926 Views
Last post Jul 21, 2007, 10:14:32 AM
by AaronB
57 Replies
25065 Views
Last post Apr 19, 2010, 08:48:05 PM
by Volcom
40 Replies
13920 Views
Last post Oct 28, 2019, 05:17:38 PM
by Rockcrawlintoy
12 Replies
4052 Views
Last post Jan 22, 2011, 11:44:10 AM
by yoshaleng