Well got all my parts in at once today. Like xmas in June. I attached my fuel fittings to the intake and ran my pressure side fuel line. Still have to work out the return. I am still having trouble with the motor mounts but im just going to drill thru the top of the frame on both sides and throw a grade 8 bolt thru just for stability and weld the rest. It will be a hard mount. Before welding in place I will be installing the headers and finding the correct placement I want the eng to be in. Havent started on it today but will start after work. Thanks for the posts also