here it is after i pushed it over to a different spot since i have been working on it in a handi cap spot for two days. The entire swap as far as getting it on the new axle and all 4 tires took about 2 days worth of work. now all i have to do at this point is breaks, shocks, steering box and linkage, 5.29s for rear, front driveline made, and a couple of other minor things