Ok more work done over the last few days...
1) box in position for fitting and had to cut the radiator support as needed while fitting the box.
2) cut the holes with a hole saw to fit the IFS bracket tubes.
3) a little clean-up work is needed to remove the left overs from the factory torque arm.