Well we're down to the last two weeks and getting the LBC in shape for the trip.
ANd it's a good thing we did pull it out and start on it now.
Initially we pulled it out to get some sealer paint on the roof, but there are other things that need work too.
Mainly right now Mark is working on the propane generator. It was all gummed up and he can't get it started.
Of course, before he realized the regulators were all gummed up, which seems to be a typical thing for propane, he was twisting the knobs all around and isn't sure how they should be set
![Ack :ack:](https://board.marlincrawler.com/Smileys/marlin/ack.gif)
But I got the roof scrubbed down, and didn't fall off so that's a start. Now I've got to wait for it to dry, and put some paint on it. At 85* in the blazing sun it shouldn't take long to dry!