Today I got the lower bars finished until I do the final welding. I cut up the tabs for the lower links to connect to the axle. Look how long those lower bars came out. The upper links gotta be at a 50 degree angle and be 4.5 inches higher than the lower links on the frame end of things. I'm thinking of going to the shop tonite and making the tabs to connect the upper links to the axle bridge.