First fab of the project done! Spent a few hours today doing this. Main tube is 5x2 .250 wall, the mounts/shackle points (which go through the tube and mount inside the frame) are 3"x1/2" flat bar. Also got the stickers off the back window and started scraping the
![That\'s Gay :stopit:](https://board.marlincrawler.com/Smileys/marlin/gay.gif)
blue/purple tint out (pic was taken before that started)