Author Topic: Synwars' 1st Gen Build  (Read 88992 times)

0 Members and 16 Guests are viewing this topic.

synwars

  • Offline Crawler Guru
  • ****
  • Turtle Points: 360
  • Male Posts: 485
  • Member since Mar '05
  • Fabbing with Maffy
    • View Profile
    • Can you feel the love?
Re: Synwars' Project Bigwig Rig
« Reply #60 on: Feb 24, 2006, 11:03:23 PM »
I didn't feel like agrivating my headache much tonight so I stuck with doing a small job. For my hydro assist steering planned for the future, I need a clamp for my tie rod. I didn't want to weld tabs on it, illegal, plus if I ever needed to swap a tie rod or make an adjustment, it wouldn't be easy. So here we go, this is what I've got so far:

1.5" OD / 1.150" ID DOM tubing with a 3/8" slit down the middle of it. Welded tabs are 3/8" flat bar, with 3/8" holes drilled in it. Alls I need now is some tabs for the hydro ram. I need the ram first however before I can weld on the tabs... Beefy though!!! :yesnod:
"Don't let common sense stop you..."

Build up thread:
http://board.marlincrawler.com/index.php?topic=11425.0

KEEP IT CLEAN PEOPLE!!! :bat:

 
 
 
 
 

Related Topics

70 Replies
23216 Views
Last post Sep 06, 2004, 09:56:32 PM
by freds40
63 Replies
17881 Views
Last post Aug 14, 2004, 06:53:08 PM
by yotaboy79
4 Replies
2745 Views
Last post May 22, 2004, 08:11:42 PM
by yotaboy79
45 Replies
12764 Views
Last post Jul 23, 2004, 06:21:15 AM
by 83yota
0 Replies
1511 Views
Last post Dec 01, 2004, 04:46:53 PM
by FATB0Y