IS THAT SWEET OR WHAT????Of course there is still a ton of work left to do, but man this was a huge milestone that feel great to have now passed!
Things off the top of my head that needs to get done before the round-up:
- Get an Intake plumbing built and get an air filter
- Modify and Mount the Downey Header
- Hook up the onboard air lines
- Wire in the Welder Back in
- Mount the Battery
- Mount misc items in the engine bay like air box, igniter, charcal canister, yadda yadda yadda
- Install the Radiator and hoses and get some coolant in this beast
- Mount the IFS Steering Box and finish the HySteer
- Rebuild the rear diff to fix a bad ARB line
- Hook up the brakes
- Hook up the throttle cable
- Hook the winch up
- Build and install a new front bumper and rock sliders
- yadda yadda yadda
What? You thought this was gonna be easy? ha!
Here are a couple more pics from tonight. A fuel leak that we had when I was testing the fuel pump circuit minuets before the first start-up, and a pic of the Jerry-rigged duct-taped Intake so that we could start it up :gap: Hey, it's the first item on the above list all-right!